{"id":118597,"date":"2025-07-10T08:43:54","date_gmt":"2025-07-10T08:43:54","guid":{"rendered":"https:\/\/rdnews.al\/?p=118597"},"modified":"2025-07-10T11:54:24","modified_gmt":"2025-07-10T11:54:24","slug":"thellohet-skandali-rama-shton-fondet-per-nnceneratorin-e-tiranes-qe-nuk-ekziston","status":"publish","type":"post","link":"https:\/\/rdnews.al\/index.php\/2025\/07\/10\/thellohet-skandali-rama-shton-fondet-per-nnceneratorin-e-tiranes-qe-nuk-ekziston\/","title":{"rendered":"Thellohet skandali! Rama shton fondet p\u00ebr inceneratorin e Tiran\u00ebs q\u00eb nuk ekziston!"},"content":{"rendered":"<p>Kontrata p\u00ebr inceneratorin e Tiran\u00ebs vijon t\u00eb jet\u00eb nj\u00eb nd\u00ebr z\u00ebrat kryesor\u00eb q\u00eb r\u00ebndon mbi financat publike.<\/p>\n<p>Ky projekt, i cili prej koh\u00ebsh \u00ebsht\u00eb p\u00ebrballur me akuza t\u00eb r\u00ebnda p\u00ebr korrupsion, vazhdon t\u00eb financohet nga buxheti i shtetit, nd\u00ebrkoh\u00eb q\u00eb objekti fizik nuk \u00ebsht\u00eb nd\u00ebrtuar dhe nuk ekziston n\u00eb terren.<\/p>\n<p>Sipas t\u00eb dh\u00ebnave zyrtare nga Ministria e Financave p\u00ebr vitin 2025 jan\u00eb planifikuar rreth 13.98 miliard\u00eb lek\u00eb p\u00ebr mb\u00ebshtetjen e kontratave koncesionare me PPP, nga t\u00eb cilat 5.59 miliard\u00eb lek\u00eb jan\u00eb investime dhe 8.39 miliard\u00eb lek\u00eb shpenzime korente.<\/p>\n<p>\u201cKrahasuar me nj\u00eb vit m\u00eb par\u00eb, kjo p\u00ebrfaq\u00ebson nj\u00eb rritje prej 683.8 milion\u00eb lek\u00ebsh, ose 5.14% m\u00eb shum\u00eb, e nxitur kryesisht nga rritja e planit t\u00eb pagesave p\u00ebr kontrat\u00ebn e inceneratorit t\u00eb Tiran\u00ebs, si dhe p\u00ebr projektin e skanimit t\u00eb kontejner\u00ebve\u201d, sqaron ministria e Financave n\u00eb lidhje me zhvillimet n\u00eb buxhetin 2025.<\/p>\n<p>Financat sqarojn\u00eb se p\u00ebr incineratorin e Tiran\u00ebs, rritja e planit t\u00eb pagesave p\u00ebr vitin 2025 \u00ebsht\u00eb nj\u00eb pasoj\u00eb direkte e mosrealizimit t\u00eb pagesave n\u00eb vitin 2024, por ajo q\u00eb bie n\u00eb sy \u00ebsht\u00eb fakti se, pavar\u00ebsisht pagesave t\u00eb vazhdueshme buxhetore, objekti nuk \u00ebsht\u00eb nd\u00ebrtuar dhe nuk ka prodhuar asnj\u00eb sh\u00ebrbim p\u00ebr qytetar\u00ebt.<\/p>\n<p>N\u00eb total, n\u00eb pes\u00eb-mujorin e par\u00eb t\u00eb vitit 2025, pagesat faktike p\u00ebr t\u00eb gjitha kontratat koncesionare me mb\u00ebshtetje buxhetore kan\u00eb arritur n\u00eb 4.24 miliard\u00eb lek\u00eb, ose 30.3% e planit vjetor, nd\u00ebrsa p\u00ebr muajin maj jan\u00eb realizuar 749.1 milion\u00eb lek\u00eb, ku projekti m\u00eb i financuar ishte ai p\u00ebr sh\u00ebrbimet laboratorike mjek\u00ebsore.<\/p>\n<p>Skandali i incenerator\u00ebve, q\u00eb ka p\u00ebrfshir\u00eb figura t\u00eb njohura politike dhe biznesi, p\u00ebrfshin pik\u00ebrisht k\u00ebt\u00eb projekt n\u00eb krye t\u00eb list\u00ebs, duke e kthyer at\u00eb n\u00eb nj\u00eb simbol t\u00eb shp\u00ebrdorimit t\u00eb fondeve publike dhe mosnd\u00ebshkimit institucional.<\/p>\n<p>Ministria e Financave thekson se monitorimi i kontratave PPP kryhet mbi baz\u00eb mujore, me q\u00ebllim kontrollin e rreziqeve dhe ruajtjen e q\u00ebndrueshm\u00ebris\u00eb fiskale.<\/p>\n<p>Por n\u00eb rastin e inceneratorit t\u00eb Tiran\u00ebs, ky monitorim duket m\u00eb shum\u00eb formal se real, pasi pagesat vijojn\u00eb pa asnj\u00eb rezultat konkret n\u00eb terren, duke thelluar mosbesimin qytetar dhe rritur presionin ndaj buxhetit t\u00eb shtetit n\u00eb m\u00ebnyr\u00eb t\u00eb pajustifikueshme.<\/p>\n<p>Projekti i Nd\u00ebrtimit i Landfillit, incineratorit dhe rehabilitimit t\u00eb vend-depozitimeve ekzistuese Tiran\u00eb dhe prodhimin e energjis\u00eb elektrike do t\u00eb financohet k\u00ebt\u00eb vit 12,7 miliard\u00eb lek\u00eb rreth 13 milion\u00eb euro.<\/p>\n<p>Sipas buxhetit 2025, ky projekt merr 9% t\u00eb totalit t\u00eb pagesave p\u00ebr koncesionet PPP financim nga buxheti.<\/p>\n<p>Si\u00e7 tregojn\u00eb faturat e detajuara t\u00eb thesarit pagesat b\u00ebhen ndaj Integrated Energy, e cila \u00ebsht\u00eb n\u00eb administrim t\u00eb shtetit, p\u00ebr shkak t\u00eb akuzave q\u00eb ngriti SPAK p\u00ebr nj\u00eb afer\u00eb t\u00eb madhe korruptive.<\/p>\n<p>Ndaj administratorit shtet paguhen fatura p\u00ebr nd\u00ebrtimin e inceneratorit, punimet e t\u00eb cilit nuk kan\u00eb filluar.<\/p>\n<p>Megjith\u00ebse ekzistojn\u00eb ligje, udh\u00ebzime, rregulla dhe struktura ligjore q\u00eb pengojn\u00eb \u00e7eljen e fondeve n\u00ebse nuk ka fatura punimesh s\u00ebrish pagesat vazhdojn\u00eb, duke prodhuar nj\u00eb d\u00ebm material dhe moral ndaj taksapaguesve shqiptare.\/<a href=\"https:\/\/monitor.al\/financat-pagesat-per-ppp-jane-rritur-me-2025-nga-shtimi-i-fondeve-per-inceneratorin-e-tiranes\/\" target=\"_blank\" rel=\"noopener\">MONITOR<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Kontrata p\u00ebr inceneratorin e Tiran\u00ebs vijon t\u00eb jet\u00eb nj\u00eb nd\u00ebr z\u00ebrat kryesor\u00eb q\u00eb r\u00ebndon mbi financat publike. Ky projekt, i cili prej koh\u00ebsh \u00ebsht\u00eb p\u00ebrballur me akuza t\u00eb r\u00ebnda p\u00ebr korrupsion, vazhdon t\u00eb financohet nga buxheti i shtetit, nd\u00ebrkoh\u00eb q\u00eb objekti fizik nuk \u00ebsht\u00eb nd\u00ebrtuar dhe nuk ekziston n\u00eb terren. Sipas t\u00eb dh\u00ebnave zyrtare nga &hellip;<\/p>\n","protected":false},"author":4,"featured_media":118598,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[37],"tags":[],"class_list":["post-118597","post","type-post","status-publish","format-standard","has-post-thumbnail","","category-politike"],"_links":{"self":[{"href":"https:\/\/rdnews.al\/index.php\/wp-json\/wp\/v2\/posts\/118597","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/rdnews.al\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/rdnews.al\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/rdnews.al\/index.php\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/rdnews.al\/index.php\/wp-json\/wp\/v2\/comments?post=118597"}],"version-history":[{"count":2,"href":"https:\/\/rdnews.al\/index.php\/wp-json\/wp\/v2\/posts\/118597\/revisions"}],"predecessor-version":[{"id":118656,"href":"https:\/\/rdnews.al\/index.php\/wp-json\/wp\/v2\/posts\/118597\/revisions\/118656"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/rdnews.al\/index.php\/wp-json\/wp\/v2\/media\/118598"}],"wp:attachment":[{"href":"https:\/\/rdnews.al\/index.php\/wp-json\/wp\/v2\/media?parent=118597"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/rdnews.al\/index.php\/wp-json\/wp\/v2\/categories?post=118597"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/rdnews.al\/index.php\/wp-json\/wp\/v2\/tags?post=118597"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}