{"id":128338,"date":"2025-11-14T09:53:15","date_gmt":"2025-11-14T09:53:15","guid":{"rendered":"https:\/\/rdnews.al\/?p=128338"},"modified":"2025-11-14T09:55:19","modified_gmt":"2025-11-14T09:55:19","slug":"korrupsion-edhe-ne-rrugen-qukes-qafe-plloce-pas-perurimit-shfaqen-shenjat-e-degradimit","status":"publish","type":"post","link":"https:\/\/rdnews.al\/index.php\/2025\/11\/14\/korrupsion-edhe-ne-rrugen-qukes-qafe-plloce-pas-perurimit-shfaqen-shenjat-e-degradimit\/","title":{"rendered":"Korrupsion edhe n\u00eb rrug\u00ebn Quk\u00ebs-Qaf\u00eb Pllo\u00e7\u00eb! Dy muaj pas p\u00ebrurimit fillon degradimi!"},"content":{"rendered":"<p>Pa kaluar dy muaj nga p\u00ebrurimi i rrug\u00ebs komb\u00ebtare Quk\u00ebs-Qaf\u00eb Pllo\u00e7\u00eb nga kryeministri Edi Rama dhe ministrja e Infrastruktur\u00ebs, Belinda Balluku jan\u00eb shfaqur p\u00ebr her\u00eb t\u00eb dyt\u00eb shenjat\u00a0 degradimit.<\/p>\n<p>Rruga e re u inauguruar m\u00eb 5 shtator, por pak dit\u00eb pas inagurimi u shfaq\u00ebn shenjat e para t\u00eb punimeve me cil\u00ebsi t\u00eb dob\u00ebt, pasi rruga u shemb n\u00eb disa vende. Nga shembja e masivit shk\u00ebmbor u bllokua nj\u00eb prej tre korsive t\u00eb segmentit rrugor, nd\u00ebrsa rr\u00ebshqitja e gur\u00ebve dhe dherave ka vijuar.<\/p>\n<p><strong>R<\/strong>r\u00ebshqitje dherash u regjistruan edhe t\u00eb m\u00ebrkur\u00ebn n\u00eb mesdit\u00eb n\u00eb fillim t\u00eb aksit, duke bllokuar nj\u00eb pjes\u00eb t\u00eb rrug\u00ebs. Fatmir\u00ebsisht nuk pati t\u00eb l\u00ebnduar, por ngjarja ka shtuar shqet\u00ebsimet p\u00ebr sigurin\u00eb e k\u00ebtij investimi gjigant.<\/p>\n<p>Ky aks rrugor, i cili u planifikua si nj\u00eb nd\u00ebr investimet m\u00eb t\u00eb r\u00ebnd\u00ebsishme strategjikisht p\u00ebr lidhjen Lindje-Per\u00ebndim, kushtoi 260 milion\u00eb euro dhe u nd\u00ebrtua gjat\u00eb 14 viteve t\u00eb fundit. Por p\u00ebrs\u00ebritja e rr\u00ebshqitjeve, vet\u00ebm pak jav\u00eb pas nj\u00eb rr\u00ebshqitjeje tjet\u00ebr shk\u00ebmbore q\u00eb bllokoi nj\u00ebr\u00ebn korsi p\u00ebr or\u00eb t\u00eb t\u00ebra, hedh dyshime serioze mbi projektimin, mbik\u00ebqyrjen dhe cil\u00ebsin\u00eb e nd\u00ebrtimit.<\/p>\n<p>Kompania kontraktore ka nd\u00ebrhyr\u00eb menj\u00ebher\u00eb p\u00ebr pastrimin e rrug\u00ebs, nd\u00ebrsa punimet p\u00ebr stabilizimin e terrenit vazhdojn\u00eb. Por fakti q\u00eb problemi shfaqet n\u00eb nj\u00eb segment q\u00eb duhej t\u00eb ishte \u201ci sigurt\u201d tregon se nuk \u00ebsht\u00eb \u00e7\u00ebshtje e rast\u00ebsis\u00eb, por nj\u00eb d\u00ebshtim sistematik n\u00eb \u00e7do faz\u00eb t\u00eb realizimit t\u00eb projektit: nga planifikimi dhe projektimi, te nd\u00ebrtimi dhe kontrolli i cil\u00ebsis\u00eb.<\/p>\n<p>N\u00eb vend q\u00eb t\u00eb leht\u00ebsoj\u00eb l\u00ebvizjen dhe t\u00eb p\u00ebrshpejtoj\u00eb zhvillimin ekonomik t\u00eb zon\u00ebs, rruga Quk\u00ebs-Qaf\u00eb Pllo\u00e7\u00eb po kthehet n\u00eb shembull t\u00eb munges\u00ebs s\u00eb p\u00ebrgjegj\u00ebsis\u00eb dhe menaxhimit t\u00eb dob\u00ebt t\u00eb fondeve publike. 260 milion\u00eb euro, shifra marramend\u00ebse q\u00eb duhet t\u00eb garantonte nj\u00eb aks t\u00eb q\u00ebndruesh\u00ebm dhe t\u00eb sigurt, nuk kan\u00eb arritur t\u00eb parandalojn\u00eb k\u00ebto d\u00ebmtime q\u00eb shfaqen q\u00eb tani.<\/p>\n<p>Rruga Quk\u00ebs-Qaf\u00eb Pllo\u00e7\u00eb duhet t\u00eb sh\u00ebrbej\u00eb si nj\u00eb paralajm\u00ebrim p\u00ebr t\u00eb gjith\u00eb institucionet, investimet e m\u00ebdha nuk jan\u00eb nj\u00eb garanci p\u00ebr cil\u00ebsi n\u00ebse mungojn\u00eb transparenca, mbik\u00ebqyrje e rrept\u00eb dhe standarde t\u00eb larta nd\u00ebrtimi.<\/p>\n<p>Ndryshe, pas 14 viteve pun\u00eb dhe 260 milion\u00eb eurove t\u00eb shpenzuara, ajo q\u00eb do t\u00eb mbetet nuk do t\u00eb jet\u00eb rruga q\u00eb lidh Lindjen me Per\u00ebndimin, por nj\u00eb kujtes\u00eb e shtrenjt\u00eb e d\u00ebshtimit dhe keqmenaxhimit.<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/boldnews.al\/wp-content\/uploads\/2025\/10\/rruga-qukes-qafe-plloce-berisha-denoncimn-750x618.jpg\" \/><\/p>\n<div class=\"readmore-text-here\">\n<p><img decoding=\"async\" src=\"https:\/\/www.syri.net\/uploads\/syri.net\/images\/2025\/November\/14\/auto_Screenshot_101763112104.png\" alt=\"Image\" \/><\/p>\n<p><img decoding=\"async\" src=\"https:\/\/www.syri.net\/uploads\/syri.net\/images\/2025\/November\/14\/auto_Screenshot_81763112108.png\" alt=\"Image\" \/><\/p>\n<p><img decoding=\"async\" src=\"https:\/\/www.syri.net\/uploads\/syri.net\/images\/2025\/November\/14\/auto_RRUGA_E_RE_DUD_CI_IA_DI1763112151.png\" alt=\"Image\" \/><\/p>\n<\/div>\n<div id=\"rekl-45\"><\/div>\n<div id=\"rekl-33\"><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Pa kaluar dy muaj nga p\u00ebrurimi i rrug\u00ebs komb\u00ebtare Quk\u00ebs-Qaf\u00eb Pllo\u00e7\u00eb nga kryeministri Edi Rama dhe ministrja e Infrastruktur\u00ebs, Belinda Balluku jan\u00eb shfaqur p\u00ebr her\u00eb t\u00eb dyt\u00eb shenjat\u00a0 degradimit. Rruga e re u inauguruar m\u00eb 5 shtator, por pak dit\u00eb pas inagurimi u shfaq\u00ebn shenjat e para t\u00eb punimeve me cil\u00ebsi t\u00eb dob\u00ebt, pasi rruga &hellip;<\/p>\n","protected":false},"author":4,"featured_media":128339,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[37],"tags":[],"class_list":["post-128338","post","type-post","status-publish","format-standard","has-post-thumbnail","","category-politike"],"_links":{"self":[{"href":"https:\/\/rdnews.al\/index.php\/wp-json\/wp\/v2\/posts\/128338","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/rdnews.al\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/rdnews.al\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/rdnews.al\/index.php\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/rdnews.al\/index.php\/wp-json\/wp\/v2\/comments?post=128338"}],"version-history":[{"count":3,"href":"https:\/\/rdnews.al\/index.php\/wp-json\/wp\/v2\/posts\/128338\/revisions"}],"predecessor-version":[{"id":128342,"href":"https:\/\/rdnews.al\/index.php\/wp-json\/wp\/v2\/posts\/128338\/revisions\/128342"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/rdnews.al\/index.php\/wp-json\/wp\/v2\/media\/128339"}],"wp:attachment":[{"href":"https:\/\/rdnews.al\/index.php\/wp-json\/wp\/v2\/media?parent=128338"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/rdnews.al\/index.php\/wp-json\/wp\/v2\/categories?post=128338"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/rdnews.al\/index.php\/wp-json\/wp\/v2\/tags?post=128338"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}