{"id":155347,"date":"2026-10-02T17:19:01","date_gmt":"2026-10-02T17:19:01","guid":{"rendered":"https:\/\/rdnews.al\/?p=155347"},"modified":"2026-10-02T17:19:01","modified_gmt":"2026-10-02T17:19:01","slug":"110-milione-leke-investime-per-gjelberimin-e-kulles-se-re-te-rames-te-parku-rinia","status":"publish","type":"post","link":"https:\/\/rdnews.al\/index.php\/2026\/10\/02\/110-milione-leke-investime-per-gjelberimin-e-kulles-se-re-te-rames-te-parku-rinia\/","title":{"rendered":"110 milion\u00eb lek\u00eb investime p\u00ebr gjelb\u00ebrimin e kull\u00ebs s\u00eb re t\u00eb Ram\u00ebs te Parku Rinia"},"content":{"rendered":"<p>Nd\u00ebrhyrja p\u00ebr prishjen e kioskave dhe rikthimin e gjelb\u00ebrimit n\u00eb Parkun Rinia ishte nj\u00eb nga sukseset m\u00eb t\u00eb njohura t\u00eb mandatit t\u00eb par\u00eb t\u00eb Edi Ram\u00ebs si kryetar i bashkis\u00eb t\u00eb Tiran\u00ebs.<\/p>\n<p>Z\u00ebvend\u00ebsimi i kioskave dhe betonit me pem\u00eb dhe sheshe publike t\u00eb hapura p\u00ebr qytetar\u00ebt, q\u00eb m\u00eb pas do t\u00eb quhet Rilindja Urbane, dhe do t\u00eb prekte cdo qytet t\u00eb vendit, ishin zanafilla p\u00ebr nd\u00ebrtimin e nj\u00eb karriere t\u00eb gjat\u00eb politike t\u00eb piktorit t\u00eb kthyer rast\u00ebsisht n\u00eb politikan. Megjithat\u00eb, sot pas 26 vitesh, \u00ebsht\u00eb p\u00ebrs\u00ebri kryeministri Rama q\u00eb i ka hapur rrug\u00ebn nj\u00eb nd\u00ebrtimi privat mbi 25 kat\u00ebsh n\u00eb zem\u00ebr t\u00eb parkut Rinia.<\/p>\n<p>M\u00eb 1 tetor 2026, qeveria <a href=\"https:\/\/www.kryeministria.al\/newsroom\/tirana-fountain-plaza-nje-tjeter-etape-e-vizionit-per-tiranen-e-vitit-2030\/\" target=\"_blank\" rel=\"noopener\">prezantoi <\/a>konkursin nd\u00ebrkomb\u00ebtar \u201cTirana Fountain Plaza\u201d p\u00ebr zhvillimin e zon\u00ebs ku ndodhet kompleksi \u201cTajvani\u201d. Sipas Kryeministris\u00eb, konkursi ishte \u201ci k\u00ebrkuar nga shteti, me nism\u00eb t\u00eb sip\u00ebrmarrjes private\u201d, nd\u00ebrsa pes\u00eb studio nd\u00ebrkomb\u00ebtare paraqit\u00ebn propozimet e tyre p\u00ebr zhvillimin e zon\u00ebs.<\/p>\n<p>Fitues u shpall studioja daneze BIG (Bjarke Ingels Group), me nj\u00eb projekt q\u00eb parashikon nj\u00eb godin\u00eb rreth 78 metra t\u00eb lart\u00eb, t\u00eb ngritur mbi kolona, me zyra, hotel dhe apartamente private, si dhe rreth tre nivele n\u00ebntok\u00ebsore p\u00ebr parkim dhe logjistik\u00eb.<\/p>\n<p>Lart\u00ebsia e propozuar ngre nd\u00ebrkoh\u00eb pik\u00ebpyetje mbi parametrat urbanistik\u00eb q\u00eb zbatohen p\u00ebr k\u00ebt\u00eb truall.<a href=\"https:\/\/faktoje.al\/tirana-nje-oaz-i-nxehte-betoni\/\" data-type=\"link\" data-id=\"https:\/\/faktoje.al\/tirana-nje-oaz-i-nxehte-betoni\/\" target=\"_blank\" rel=\"noopener\"> Faktoje <\/a>ka raportuar m\u00eb her\u00ebt p\u00ebr nd\u00ebrtimet n\u00eb qend\u00ebr t\u00eb Tiran\u00ebs ku lart\u00ebsia e parashikuar nga Plani i P\u00ebrgjithsh\u00ebm Vendor \u00ebsht\u00eb 9 kate dhe ky projekt duket se e tejkalon.<\/p>\n<p>P\u00ebr m\u00eb tep\u00ebr projekti do t\u00eb zhvillohet n\u00eb nj\u00eb hap\u00ebsir\u00eb q\u00eb g\u00ebzon edhe status t\u00eb posa\u00e7\u00ebm mbrojtjeje. Parku Rinia figuron q\u00eb prej vitit 2007 si Monument Kulture i Kategoris\u00eb II.<\/p>\n<p>BIG nuk \u00ebsht\u00eb nj\u00eb em\u00ebr i ri n\u00eb projektet e m\u00ebdha t\u00eb kryeqytetit. Studioja \u00ebsht\u00eb edhe projektuese e Teatrit t\u00eb ri Komb\u00ebtar. N\u00eb faqen zyrtare t\u00eb BIG, projekti <a href=\"https:\/\/big.dk\/projects\/national-theatre-of-albania-6175\" target=\"_blank\" rel=\"noopener\">figuron<\/a> me status \u201cIn Construction\u201d, me madh\u00ebsi 8,000 m\u00b2, dhe klient kompanin\u00eb \u201cFusha LLC\u201d. Tenderin publik p\u00ebr <a href=\"https:\/\/www.openprocurement.al\/en\/tender\/view\/id\/48277\" target=\"_blank\" rel=\"noopener\">Faz\u00ebn I<\/a> e fitoi bashkimi AGI KONS-BE-IS, me vler\u00eb 2.2 miliard\u00eb lek\u00eb pa TVSH. AGI KONS \u00ebsht\u00eb e nj\u00ebjta kompani q\u00eb <a href=\"https:\/\/openprocurement.al\/en\/tender\/view\/id\/26989\" target=\"_blank\" rel=\"noopener\">fitoi tenderin<\/a> kryesor p\u00ebr rehabilitimin e Parkut Rinia n\u00eb vitin 2019.<\/p>\n<p>Projekti vjen n\u00eb nj\u00eb koh\u00eb kur zhvillimi intensiv i nd\u00ebrtimit n\u00eb qend\u00ebr t\u00eb Tiran\u00ebs ka ngritur prej vitesh debat mbi raportin mes nd\u00ebrtimeve t\u00eb reja dhe hap\u00ebsirave publike e t\u00eb gjelbra, nj\u00eb problematik\u00eb t\u00eb dokumentuar m\u00eb her\u00ebt edhe nga Faktoje.<\/p>\n<p><strong>Sa para publike jan\u00eb investuar n\u00eb Parkun Rinia p\u00ebrpara transformimit t\u00eb radh\u00ebs?<\/strong><\/p>\n<p><strong>Nga kioskat e viteve \u201990 te rehabilitimi i vitit 2000<\/strong><\/p>\n<p>Parku Rinia ka kaluar disa etapa transformimi edhe p\u00ebrpara rehabilitimit t\u00eb vitit 2019.<\/p>\n<p><a href=\"https:\/\/tirana.al\/pikat-e-interesit\/atraksione-ne-tirane\/parku-rinia\" target=\"_blank\" rel=\"noopener\">Bashkia e Tiran\u00ebs <\/a>dhe Agjencia e Parqeve dhe Rekreacionit e lidhin konceptimin e k\u00ebsaj hap\u00ebsire me planet urbanistike t\u00eb viteve 1930, nd\u00ebrsa pyll\u00ebzimi i parkut u krye n\u00eb vitin 1949.<\/p>\n<p>Pas vitit 1991, parku u mbush me nd\u00ebrtime informale, kryesisht kioska, bare dhe restorante. Sipas <a href=\"https:\/\/aprtirana.al\/parqe-rekreative\/parku-rinia\/\" target=\"_blank\" rel=\"noopener\">Agjencis\u00eb s\u00eb Parqeve dhe Rekreacionit<\/a>, gjat\u00eb pastrimit t\u00eb zon\u00ebs n\u00eb vitin 2000 u shemb\u00ebn 130 objekte dhe u hoq\u00ebn mbi 45 mij\u00eb metra kub mbetje, nd\u00ebrsa parku u rehabilitua.<\/p>\n<p>N\u00eb fillim t\u00eb viteve 2000 mori form\u00eb edhe kompleksi \u201cTajvani\u201d q\u00eb njohim sot. Shoq\u00ebria <a href=\"https:\/\/opencorporates.al\/sq\/nipt\/k32022001u\" target=\"_blank\" rel=\"noopener\">TAIWAN sh.p.k.<\/a>, e cila lidhet me kompleksin dhe m\u00eb pas me koncesionin e parkimit, figuron e themeluar n\u00eb maj 2001.<\/p>\n<p><strong>Parkimi n\u00ebntok\u00ebsor, nj\u00eb histori q\u00eb mbetet pezull<\/strong><\/p>\n<p>N\u00eb vitin 2008, <a href=\"https:\/\/openprocurement.al\/tenders\/\/agreements\/VKB_Nr.36_Date29.09.2008.pdf\" target=\"_blank\" rel=\"noopener\">K\u00ebshilli Bashkiak i Tiran\u00ebs<\/a> miratoi form\u00ebn e dh\u00ebnies me koncesion t\u00eb dy parkimeve n\u00ebntok\u00ebsore n\u00eb qytet. M\u00eb pas u zhvillua procedura p\u00ebr Parkun Rinia dhe m\u00eb 26 prill 2016 u n\u00ebnshkrua kontrata e <a href=\"https:\/\/opencorporates.al\/en\/nuis\/l61719010e\" target=\"_blank\" rel=\"noopener\">koncesionit <\/a>mes Bashkis\u00eb Tiran\u00eb dhe shoq\u00ebris\u00eb \u201cT A I W A N\u201d.<\/p>\n<p>P\u00ebr zbatimin e kontrat\u00ebs u krijua shoq\u00ebria koncesionare Tirana Parking, e themeluar n\u00eb maj 2016. <a href=\"https:\/\/opencorporates.al\/en\/nipt\/L61719010E\" target=\"_blank\" rel=\"noopener\">Objekti<\/a> i saj p\u00ebrfshin projektimin, financimin, nd\u00ebrtimin, operimin dhe mir\u00ebmbajtjen e nj\u00eb parkimi n\u00ebntok\u00ebsor n\u00eb Parkun Rinia, si dhe transferimin e tij te Bashkia n\u00eb p\u00ebrfundim t\u00eb afatit t\u00eb koncesionit.<\/p>\n<p>Dokumentacioni i <a href=\"https:\/\/openprocurement.al\/sq\/concession\/view\/id\/1\" target=\"_blank\" rel=\"noopener\">koncesionit<\/a> parashikonte nj\u00eb investim rreth 1.97 miliard\u00eb lek\u00eb dhe nj\u00eb parkim me 1,342 vende dhe koh\u00ebzgjatje prej 35 vjet\u00ebsh. <a href=\"https:\/\/faktoje.al\/projekti-i-parkut-rina-me-vlere-1-miliard-leke-dhe-mungesa-e-parkingut-te-premtuar\/\" target=\"_blank\" rel=\"noopener\">Faktoje<\/a> verifikoi n\u00eb qershor 2020 se rehabilitimi i Parkut Rinia kishte p\u00ebrfunduar pa parkimin n\u00ebntok\u00ebsor q\u00eb ishte premtuar m\u00eb her\u00ebt nga zyrtar\u00ebt e Bashkis\u00eb.<\/p>\n<p><strong>2018: projekti i ri p\u00ebr rehabilitimin e parkut<\/strong><\/p>\n<p>N\u00eb vitin 2018, Bashkia Tiran\u00eb zhvilloi procedur\u00ebn \u201cStudim projektim p\u00ebr objektin \u2018Rehabilitimi i Parkut Rinia\u2019\u201d.<img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/ads.adsense.al\/www\/delivery\/lg.php?bannerid=0&amp;campaignid=0&amp;zoneid=138&amp;loc=https%3A%2F%2Fboldnews.al%2F2026%2F10%2F02%2Fparku-rinia-110-milione-leke-investime-per-gjelberimin-e-kulles-se-re-te-rames%2F&amp;referer=https%3A%2F%2Fboldnews.al%2Fcategory%2Faktualitet%2F&amp;cb=329e5eac18\" alt=\"\" width=\"0\" height=\"0\" \/><\/p>\n<p>Fitues u shpall bashkimi SON Engineering &amp; Construction-A&amp;E Engineering. <a href=\"https:\/\/openprocurement.al\/sq\/tender\/view\/id\/17561\" target=\"_blank\" rel=\"noopener\">Kontrata<\/a> u lidh p\u00ebr 3,492,480 lek\u00eb me TVSH.<\/p>\n<p>Ky projektim i hapi rrug\u00eb tenderit shum\u00eb m\u00eb t\u00eb madh t\u00eb vitit pasardh\u00ebs.<\/p>\n<p><strong>2019: rreth 100 milion\u00eb lek\u00eb p\u00ebr rehabilitimin<\/strong><\/p>\n<p>M\u00eb 30 prill 2019, Bashkia Tiran\u00eb shpalli tenderin p\u00ebr \u201cRehabilitimin e Parkut Rinia\u201d.<\/p>\n<p>N\u00eb procedur\u00eb mor\u00ebn pjes\u00eb tet\u00eb operator\u00eb ekonomik\u00eb. Fitues u shpall AGI KONS. <a href=\"https:\/\/openprocurement.al\/en\/tender\/view\/id\/26989\" target=\"_blank\" rel=\"noopener\">Kontrata <\/a>u lidh m\u00eb 10 korrik 2019 p\u00ebr 94,446,931 lek\u00eb me TVSH.<\/p>\n<p>Open Procurement e ka sh\u00ebnuar procedur\u00ebn me \u201cflamur t\u00eb kuq\u201d, pasi operator\u00ebt e tjer\u00eb konkurrues, p\u00ebrfshir\u00eb ofert\u00ebn me vler\u00ebn m\u00eb t\u00eb ul\u00ebt, u skualifikuan.<\/p>\n<p>P\u00ebrve\u00e7 punimeve, Bashkia zhvilloi edhe procedur\u00ebn e mbik\u00ebqyrjes.<\/p>\n<p>P\u00ebr lotin \u201cMbik\u00ebqyrja e punimeve p\u00ebr objektin Rehabilitimi i Parkut Rinia\u201d, <a href=\"https:\/\/www.openprocurement.al\/sq\/tender\/view\/id\/28099?\" target=\"_blank\" rel=\"noopener\">fitues<\/a> u shpall INFRATECH, me ofert\u00eb 1,626,365 lek\u00eb pa TVSH.<\/p>\n<p>Parku u hap p\u00ebr publikun m\u00eb 1 qershor 2020. <a href=\"https:\/\/faktoje.al\/projekti-i-parkut-rina-me-vlere-1-miliard-leke-dhe-mungesa-e-parkingut-te-premtuar\/\" target=\"_blank\" rel=\"noopener\">Faktoje<\/a> konstatoi at\u00ebher\u00eb se parkimi n\u00ebntok\u00ebsor i premtuar nuk ishte realizuar.<\/p>\n<p><strong>Vet\u00ebm dy vjet m\u00eb von\u00eb, nd\u00ebrhyrje t\u00eb reja<\/strong><\/p>\n<p>Investimi i vitit 2019 nuk e mbylli fatur\u00ebn e Parkut Rinia.<\/p>\n<p>N\u00eb qershor 2022, Agjencia e Parqeve dhe Rekreacionit hapi tenderin \u201cRehabilitimi i Shtresave t\u00eb Lodrave tek <a href=\"https:\/\/faktoje.al\/parku-rinia-ende-jo-funksioanal-dy-muaj-pas-perfundimit-te-afatit-per-rehabilitimin\/\" target=\"_blank\" rel=\"noopener\">Parku Rinia<\/a>\u201d.<\/p>\n<p>N\u00eb procedur\u00eb mori pjes\u00eb vet\u00ebm nj\u00eb ofertues: bashkimi Nexhmedin Sadiku-ED KONSTRUKSION. Kontrata u lidh p\u00ebr 4,935,232 lek\u00eb me TVSH. <a href=\"https:\/\/open-contracting.al\/en\/pcompany\/view\/id\/9013\/isbashki\/1?\" target=\"_blank\" rel=\"noopener\">Open Procurement<\/a> e sh\u00ebnon procedur\u00ebn me \u201cflamur t\u00eb kuq\u201d p\u00ebr munges\u00eb konkurrence.<\/p>\n<p>P\u00ebr mbik\u00ebqyrjen e k\u00ebtyre punimeve, <a href=\"https:\/\/openprocurement.al\/sq\/tender\/view\/id\/46916?\" target=\"_blank\" rel=\"noopener\">fitues <\/a>u shpall M.A.K Studio, me kontrat\u00eb 102,984 lek\u00eb me TVSH.<\/p>\n<p>Po n\u00eb vitin 2022, Agjencia e Parqeve dhe Rekreacionit zhvilloi <a href=\"https:\/\/openprocurement.al\/en\/pcompany\/view\/id\/9017\/isbashki\/1?\" target=\"_blank\" rel=\"noopener\">tenderin <\/a>\u201cSistem Ujit\u00ebs n\u00eb Parkun Rinia\u201d. Fitues u shpall \u201cGjelb\u00ebrimi 2000\u201d, me okontrat\u00eb 4,790,220 lek\u00eb me TVSH. N\u00eb gar\u00eb kishte vet\u00ebm nj\u00eb ofertues dhe procedura \u00ebsht\u00eb sh\u00ebnuar me flamur t\u00eb kuq p\u00ebr munges\u00eb konkurrence. P\u00ebr mbik\u00ebqyrjen e sistemit ujit\u00ebs u <a href=\"https:\/\/openprocurement.al\/en\/tender\/view\/id\/46926\" target=\"_blank\" rel=\"noopener\">shpall<\/a> fituese NOVATECH STUDIO, me kontrat\u00eb 120,000 lek\u00eb pa TVSH.<\/p>\n<p><strong>Sa shkon fatura?<\/strong><\/p>\n<p>Duke p\u00ebrjashtuar koncesionin e parkimit n\u00ebntok\u00ebsor, nd\u00ebrhyrjet e dokumentuara p\u00ebr periudh\u00ebn 2018-2022 arrijn\u00eb n\u00eb t\u00eb pakt\u00ebn:<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-medium wp-image-1741067\" src=\"https:\/\/boldnews.al\/wp-content\/uploads\/2026\/10\/Screenshot_1-6-640x362.png\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" srcset=\"https:\/\/boldnews.al\/wp-content\/uploads\/2026\/10\/Screenshot_1-6-640x362.png 640w, https:\/\/boldnews.al\/wp-content\/uploads\/2026\/10\/Screenshot_1-6.png 725w\" alt=\"\" width=\"640\" height=\"362\" data-pin-no-hover=\"true\" \/><\/p>\n<p><strong>Projekti \u201cBIG\u201d<\/strong><\/p>\n<p>P\u00ebr projektin e ri \u201cTirana Fountain Plaza\u201d mbeten ende disa t\u00eb dh\u00ebna t\u00eb papublikuara: vlera e investimit, sip\u00ebrfaqja totale e nd\u00ebrtimit, gjurma e sakt\u00eb e godin\u00ebs s\u00eb re dhe raporti mes pron\u00ebs private dhe hap\u00ebsir\u00ebs publike q\u00eb do t\u00eb preket nga nd\u00ebrhyrja.<\/p>\n<p>Po ashtu mbetet p\u00ebr t\u2019u sqaruar statusi aktual i koncesionit t\u00eb parkimit n\u00ebntok\u00ebsor t\u00eb vitit 2016 dhe n\u00ebse ai ka ndonj\u00eb lidhje juridike, pron\u00ebsore apo financiare me projektin e ri.<a href=\"https:\/\/faktoje.al\/parku-rinia-110-milione-leke-investime-per-gjelberimin-e-kulles-se-re\/\" target=\"_blank\" rel=\"noopener\"><strong> \/Faktoje.al<\/strong><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Nd\u00ebrhyrja p\u00ebr prishjen e kioskave dhe rikthimin e gjelb\u00ebrimit n\u00eb Parkun Rinia ishte nj\u00eb nga sukseset m\u00eb t\u00eb njohura t\u00eb mandatit t\u00eb par\u00eb t\u00eb Edi Ram\u00ebs si kryetar i bashkis\u00eb t\u00eb Tiran\u00ebs. Z\u00ebvend\u00ebsimi i kioskave dhe betonit me pem\u00eb dhe sheshe publike t\u00eb hapura p\u00ebr qytetar\u00ebt, q\u00eb m\u00eb pas do t\u00eb quhet Rilindja Urbane, dhe &hellip;<\/p>\n","protected":false},"author":4,"featured_media":155348,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[37],"tags":[],"class_list":["post-155347","post","type-post","status-publish","format-standard","has-post-thumbnail","","category-politike"],"_links":{"self":[{"href":"https:\/\/rdnews.al\/index.php\/wp-json\/wp\/v2\/posts\/155347","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/rdnews.al\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/rdnews.al\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/rdnews.al\/index.php\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/rdnews.al\/index.php\/wp-json\/wp\/v2\/comments?post=155347"}],"version-history":[{"count":1,"href":"https:\/\/rdnews.al\/index.php\/wp-json\/wp\/v2\/posts\/155347\/revisions"}],"predecessor-version":[{"id":155349,"href":"https:\/\/rdnews.al\/index.php\/wp-json\/wp\/v2\/posts\/155347\/revisions\/155349"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/rdnews.al\/index.php\/wp-json\/wp\/v2\/media\/155348"}],"wp:attachment":[{"href":"https:\/\/rdnews.al\/index.php\/wp-json\/wp\/v2\/media?parent=155347"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/rdnews.al\/index.php\/wp-json\/wp\/v2\/categories?post=155347"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/rdnews.al\/index.php\/wp-json\/wp\/v2\/tags?post=155347"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}